The ingenuity to innovate. With a firm grasp of evolving technologies and an eye towards energy efficiency and sustainability, our innovative solutions deliver long-term value (and ROI) for our clients. Engineer with VIP.
Our LEED®-accredited engineers design systems with long-term life cycle costs in mind because properly engineered systems based on this strategy tend to provide the results our clients are looking for – they hold up better over time, cost less to operate and are generally more environmentally conscious.
Our engineers are known for being pioneers of our industry. They have been a part of some of the first (successful) local ground-source variable refrigerant volume systems, active chilled beam systems and microturbine-based co-generation and trigeneration systems.
From concept to design, our engineers guide each project through installation, commissioning and follow-up services, while identifying ways to help the customer save construction and operating dollars. Our engineering specialists provide HVAC, plumbing, fire protection, electrical, IT and structural design services and find solutions that address each customer’s requirements, budget and timetable.
Whether you own a property or are looking to purchase a property, our expert staff can perform a Building Condition Survey. This examines existing conditions and provides valuable information needed to make key decisions and/or better negotiate a purchase.
Engineering was last modified: February 7th, 2017 by mindshare_admin
Tessy has seen a tremendous amount of growth since 1973 and we are proud to have been their partner in bringing their vision to life.
The VIP team first engaged with Tessy in 1999 to design and construct a new 40,000 SF building to accommodate increased manufacturing needs.
The energy-conserving technologies used led to approximately $900,000 in recaptured construction cost through rebates from the New York State Energy Research and Development Authority (NYSERDA).
Since 2000, we constructed over 388,003 SF for Tessy Plastics.
Tessy Plastics
Tessy has seen a tremendous amount of growth since 1973 and we are proud to have been their partner in ▶
Tessy has seen a tremendous amount of growth since 1973 and we are proud to have been their partner in bringing their vision to life.
Tessy Plastics
Architecture
The VIP team first engaged with Tessy in 1999 to design and construct a new 40,000 SF building to accommodate increased manufacturing needs.
Tessy Plastics
engineering
The energy-conserving technologies used led to approximately $900,000 in recaptured construction cost through rebates from the New York State Energy Research and Development Authority (NYSERDA).
Tessy Plastics
construction
Since 2000, we constructed over 388,003 SF for Tessy Plastics.
architecture
engineering
construction
development
Project Details
Delivery Method: Design-Build Owner: Tessy Plastics Total Size: 428,003 SF
Tessy Plastics Corporation, a leading global contract manufacturer, gives shape to their clients’ ideas, from products for a medical device supplier to consumer goods for Fortune 100 companies. Tessy has seen a tremendous amount of growth since 1973 and VIP Structures is proud to have been their partner in bringing their vision to life.
We were first engaged with Tessy in 1999 to design and construct a new 40,000 SF building to accommodate increased manufacturing needs. Shortly thereafter, we went to work on a 14,000 SF addition to one of their existing buildings. Between 2002 and 2008 we designed and constructed over 180,000 SF of distribution and manufacturing space. These expansions took into account Tessy Plastics’ diverse clientele, from incorporating manual assembly lines to fully automated clean room environments. In 2010 our team worked on a 93,000 SF manufacturing building, which we added onto in 2013 with a 99,800 SF warehouse/distribution facility.
Tessy Plastics is committed to innovation and as their business evolves, so have the solutions that VIP Structures provides. Our in-house engineering division assessed the facility’s HVAC needs with an eye towards creating greater operating efficiency and reducing cost. In addition, efficiencies were realized with the magnet-bearing frictionless centrifugal chiller, digital control system, water-cooled air compressors and high-efficiency condensing boilers for dehumidification control to improve manufacturing efficiencies. These energy-conserving technologies led to approximately $900,000 in recaptured construction cost through rebates from the New York State Energy Research and Development Authority (NYSERDA).
Kip has been with IPD for almost two years. After joining us as an Engineering Designer, he recently got his license and was promoted to Structural Engineer. He has participated in numerous projects, most notably as the main client contact for all O-AT-KA projects. He has recently taken on more overall project responsibility with the start of the Entergy project.